National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


什邡市| 湄潭县| 庄浪县| 安西县| 西青区| 普宁市| 郎溪县| 林甸县| 建始县| 石林| 漯河市| 高青县| 阳西县| 芷江| 古丈县| 仙居县| 伊春市| 宁城县| 尼玛县| 临洮县| 怀集县| 黔江区| 兰西县| 昭苏县| 平潭县| 蒲江县| 冀州市| 鹤山市| 双辽市| 富阳市| 桃源县| 南陵县| 陈巴尔虎旗| 从化市| 信阳市| 龙井市| 湄潭县| 慈利县| 临桂县| 汉中市| 聊城市|